Our crew worked to a phased erection sequence that kept the building operational throughout access routes, entrances and pedestrian walkways stayed open and protected behind hard barriers and signage. Every lift was tied into the structure and inspected before handover, and the scaffold was tagged and re-inspected on a set cycle for the duration of the works.
All erection was carried out by trained scaffolders under full fall-arrest protection, with daily toolbox talks and a permit system agreed with the site team. The job was completed with zero lost-time incidents.
Our scaffolding project at Tullow Ghana reflects our commitment to safe access, disciplined site conduct and structural integrity at height. Working alongside the client's project team, we delivered a scaffold that met their standards and kept their people moving.
Two things to fill in before publishing: swap in the real duration, number of lifts or square metres of scaffold if you have them (specific figures do a lot of work on a case study page), and confirm whether the system used was Ringlock or tube-and-coupler so the copy names it. Also worth naming the main contractor if Viram Mariv was subcontracted rather than engaged directly it changes how the credit reads.
Our scaffolding project at Tullow Ghana reflects our commitment to safe access
learn moreComplete the form to review, cancel or extend your booking.